Green Ray

Working Documentation Stage (WD)

At this stage, the Designer develops a complete package of documentation and drawings (working documentation), necessary and sufficient for all construction, installation, commissioning works in order to put the capital construction project into operation.

There are following sections of the Working Documentation (WD) in Russia:

  1. Structural and spatial planning solutions;
  2. Engineering equipment and networks – technological solutions;
  3. Power supply systems;
  4. Instrumentation and automation;
  5. Water supply system;
  6. Gas and fuel supply system ;
  7. Construction management plan, cost estimates;
  8. Environment;
  9. Fire safety;
  10. Requirements to ensure the safety of operation;
  11. Civil defense and emergencies; < / li>
  12. Energy efficiency.

The experience of employees of Green Ray company in the works related to Detailed Design is presented in Tables 2 and 4 on the page "Company" in the section "Qualifications & Experience" of this website.