Report of Heat-Technical Survey of furnaces P-701/1, H-601/1 and P-601/2 from Section S-001 of Deep Processing Complex KT-1/1 for refining the bottom of the column and residues from AD Unit dated March 23, 2012
Conclusions on the operation of C-001 section Furnaces after overhaul:
Reconstruction of the KT-1/1 complex and the implementation of the energy efficiency improving projects at the Furnaces have reduced the specific fuel consumption of the Complex KT-1/1 by about 13.5%
(the expert assessment was made based on the data of the fuel consumption Program)
The Letter from JSC “Gazpromneft - Omsk Refinery” to LLC “LENGIPRONEFTECHIM” of PJSC «Surgutneftegas»
We inform you that from 2012 to the present [5 years at the time of writing the letter], the ceramic coating on the furnaces of the KT-1/1, Aromatics Production Complex, AVD-6 installations of JSC “Gazpromneft – Omsk Refinery” has been in an undamaged state.
During the period of operation of the furnaces after the use of HEC, a stable positive effect is observed in reducing the temperature of the wall of the furnace coils by an average of 100-150 ° C, increasing the efficiency of the furnaces to 3%, saving fuel by an average of 3-5% (depending on the type of furnace and the ratio of liquid and gas fuel).
The fuel used in the furnaces of these installations is combined (fuel gas and liquid process fuel). The fuel ratio varies depending on the production program, there are periods with the consumption of liquid process fuel up to 50-60%, at this time the share of liquid fuel is 10-30%.
A.A.Nikitin, Deputy General Director - Technical Director