From 2016 to the present at the Panchevo Refinery of JSC "NIS a. d. Novi Sad" Furnace Blackening Technology was applied in 10 furnaces at 4 Units :

  • S-2100 Atmospheric Distillation Unit (1 furnace);
  • S-2200 Vacuum Distillation Unit (2 furnaces);
  • S-300 gasoline Catalytic Reforming Unit (6 furnaces);
  • MHC/DHT Hydrocracking and Hydrotreating Unit (1 furnace).

Letter from the Processing Block of JSC "NIS a.d. Novi Sad" from 20.02.2017. Ref.No. 32-23-4/69 on the results of the implementation of the Furnace Blackening Technology with HEC coatings in the BA-2101 Furnace at the S-2100 Atmospheric Distillation Unit and BA-2201 A/B Furnaces at the S-2200 Vacuum Distillation Unit at the Panchevo Refinery in 2016:

We are grateful for the timely and high-quality implementation of the project for applying High-Emissivity Ceramic (HEC) coatings to the furnaces of Atmospheric and Vacuum Distillation Units in September 2016

Sergiy Pervyakov, Director of the Technical Directorate of the Processing Department in "NIS a.d. Novi Sad"

Green Ray

Letter from the Directorate of Energy of JSC "NIS a.d. Novi Sad" dated 06/15/2021, Ex. No. DVN102000/IZDO/3753/2021 based on the results of of the implementation of the Furnace Blackening Technology with HEC coatings in the BA-301/302/303/304, BA-305 and BA-306 of the combined S-300 platforming and hydrotreating unit at the Pancevo refinery in 2018:

"During period from 24.02.2018 to 06.03.2018, the project to increase the energy efficiency and stable operation of the furnaces of the S-300 section, the combined catalytic reforming unit "PLATFORMING" and hydrotreating unit "UNIFINING" was implemented. Inside the radiation chamber of the furnaces BA-301, 302, 303, 304, BA-305, BA-306, a high emissivity ceramic coating was applied to tubes and refractory lining.

The licensor of the process is UOP (USA), detailed design and engineering services were provided by Lummus Company. Burner equipment in furnaces manufactured by John Zink.

According to comparable operational data "Before" and "After" application of high-emissivity coatings, the actual effect of reducing the specific consumption of conventional fuel was achieved. The average value of actual effect for the S-300 section was 4.5%, which is recorded in the form of an official report. "

Ivan Kuznetsov, Head of Directorate of Energy in "NIS a.d. Novi Sad"

Green Ray

In all the above-mentioned works at PJSC "NIS Gazprom Neft", employees of "Green Ray Ltd" took an active part at all stages of Projects implementation.

luklukrosneftsiburslav

Expierence of Green Ray Ltd. company's employees on the works related to the implementation of Furnace Blackening Technology (FBT) using High Emissivity Ceramic (HEC) coatings are described on the page "FBT Reference List on Russia & Europe in 2011-2022" of this website.

Reference lists of Green Ray Ltd.'s employees on the performed work are posted on the "Qualifications and Experience" page of this site.

Customer reviews regarding the works performed by Green Ray Ltd. company's employees are posted on the "Feedback" page of this website.