Reviews from LUKOIL about FBT

Green Ray

luk

The implementation of Furnace Blacaning Tehnology (FBT) at PJSC "LUKOIL" has been performed on 5 Furnaces at the following production sites:

  • P-101 Furnace on the AVD-1 Unit at JSC "LUKOIL Neftochim Burgas" in 2015;
  • Two chambers of four into P-1 Furnace on the gasoline Catalytic Reforming Unit (CRU) at JSC "LUOKOIL Neftochim Burgas" in 2016;
  • P-101 Furnace on the AVD-1 Unit at JSC "LUKOIL Neftochim Burgas" in 2018. Recovering of the coating was made in connection with the replacement of the coil tubes in the radiation chamber of the Furnace. As well as taking into account the payback periods of projects, wich has duration from 4 months to a year without any capital investments from the Customer.
  • P-102 Furnace on Fluid Catalytic Cracking Unit (FCCU) at JSC "LUKOIL Neftochim Burgas" in 2018;
  • 200H-1 Furnace on the pre-hydrotreating section on L-35/21-1000 Catalytic Reforming Unit (CRU) at "LUKOIL - Nizhny Novgorod Refinery" in 2018.
  • F-001 Furnace on the Delayed Coking Unit No.59 (DCU) at LLC "LUKOIL - Volgograd Refinery" in 2021.

lnhb nnos volgograd

You can see Customer reviews from PJSC "LUKOIL" in the website bar on the left side of this website page.

The FBT Projects in the Republic of Bulgaria are different from the others. They are implemented on the terms of energy service contracts without  capital costs on the part of "LUKOIL Neftochim Burgas". These Projects have a good economy and a quick payback period (from 4 to 12 months). This is due to the fact that the price of energy resources is closer to the European market, and the refinery's internal price of fuel is estinated more realistically and openly as a part of the costs of various hydrocarbon processes. Details are in the site bar on the left side of the site page.

Employees of "Green Ray Ltd." (Supervisors) took an active part in the implementation of all completed Projects, starting with the presentation, study of the possibility of energy service contracts application and ending with technical inspections of the condition of ceramic coatings during shutdowns for repairs.

Expierence of Green Ray Ltd. company's employees on the works related to the implementation of Furnace Blackening Technology (FBT) using High Emissivity Ceramic (HEC) coatings are described on the page "FBT Reference List on Russia & Europe in 2011-2022" of this website.

Reference lists of Green Ray Ltd.'s employees on the performed work are posted on the "Qualifications and Experience" page of this site.

Customer reviews regarding the works performed by Green Ray Ltd. company's employees are posted on the "Feedback" page of this website.